The location for the new Crescent Beach Force Main in Surrey’s Mud Bay requires crews to time their activities with low tides and daylight hours as they do preparatory soil testing in advance of tunnel drilling activities. It’s part of a project that conveys wastewater from South Surrey, White Rock and Crescent Beach to the Annacis Island Wastewater Treatment Plant.
Metro Vancouver Video: Crescent Beach Force Main Replacement Project